No pics of the hassle it was to get the new cable pulled down the hall, but upon hitting the utility room, I decided to see if there was breaker space in the 100A sub panel. The bottom left, 2-pole 30A breaker has nothing landed on it so the decision was made to pull to this panel and grab the hot tub service from it. The saved us the hassle of pulling 60 more feet of cable through the hall ceiling and having to crawl through the crawl space to get to the main breaker panel.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.