The new drain location all mocked up. The 2x12s will all get a ton of 4" screws driven in them and then I'll bridge the opening with more lumber and Head-Lok screws to restore the integrity of this area. Virtually all the load here is compressive so it should be plenty strong.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.