AE Bathroom Remodel
I got the floating becch frame installed. Those are 3/4" diameter bolts holding it up. They're torqued to spec (I don't recall the exact number off the top of my head) and then the 'pan' is flled with a pretty dry mortar mix. The folowing day, the bolts are re-torqued to a slightly higher value and it's ready to finish.