Most of the copper work is done. Water is back on and there are no leaks. The mistake I mentioned previously? I forgot to address the cold supply feed to the vanity. There wasn't room to slip a tee in at the valve, so I had to reroute it through the stud on the right. 1/2" pipe going up between the 3/4" supplies is for the shower. Open stub will be run over to the location where the handheld unit will be.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.