Backyard
I needed to connect the irrigation in this bed to the bed behind the pool on the West side of the slide. so I dug a small trench at the base of the wall and started laying my pipe. Initially, I was going to add a valve to the hill manifolds for the beds behind the pool, but then realized I only had 1 open spot left on the Rachio controller and, even worse, no more conductors left in the cable. In the end, tying these beds together made sense as the run times would be an hour or more for these zones, not the 12-18 minutes of the others.