I opened up the drywall to expose the studs at either end of the new header location so I could encapsulate the header between them. I also trimmed the drywall a bit higher so I had access to cut the cripples and get my driver in to drive screws and secure the cripples to the new header.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.