The concrete guys were due out to cut my new slab today, but when I got home from work, there was no sign of them. As a last ditch effort to clear the blockage I opened up the trench outside the slab form and snipped the conduit. I plan to use something to slide towards the blockage and break it up. After almost 4 hours with a hammer, rebar, a couple long drill bits I have and more than a few choice words, I made about 1/4" of progress. Best guess is the blockage is about 6" in length. Concrete guys never did show up, but I got a text message at 5:18pm saying they wouldn't be coming (No kidding....) and "promised" to get it done Friday (You know, the day the hot tub is supposed to be delivered)
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.