The existing slab has a slope going away from the house. To keep the new slab level between all the footings for the gazebo posts and not cause a trip hazard at the left corner (Where Reuben is working) they set up a straight edge at 9" from the existing slab and will 'fade' the new slab in to the old.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.