Rough layout of the slab. It will be roughly 15' square with a few footings poured for the gazebo's posts. The septic cleanout will get a short section of Solatube around it and then be flushed with the slab once everything is finished. When I build the deck around the hot tub, I'll make a section removable for servicing the septic system.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.