2 days before the installers are due so my son and I got all the flooring upstairs so it could acclimate to the warmer temperatures up here. The garage is not heated and it's December so it's been pretty cold at night down there. We estimated this pile would do the great room and the Master bedroom. The boxes on top are stair nose and t-molding.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.