Electrical will go down the left side of the trench, right against the foundation wall, Gas line will go in the deeper section on the right. I'll pass the gas line behind and below the electric and cable/telco conduits then hug the foundation wall until I get to the meter.
All images copyright Kevin A. Spousta. Unauthorized use is prohibited.